It is epoxy-based, two-component, solvent-free floor and moisture tolerant floor chemical.
- In case of concrete surface with new screed on it, it is applied at the end of 5 days on the concrete with high moisture content without waiting for 21 days, the full cure time of the concrete,
- For repair of breaks and cracks on the surface.
- It may be used as levelling mortar.
- High moisture tolerance,
- Coring on green concrete (wet concrete),
- Possible to apply on the parquet 1 day later,
- Easy to apply by use of roller and trowel thanks to thixotropic structure,
- Easy adhesion of parquet thanks to its texture surface,
- Use of it as levelling mortar for repair of breaks and cracks.
Finish | : Mat |
Color | : Pink |
Density | :1,5 ± 0,05 kg/l (A+B) |
Mix Ratio | :10:5 (A:B weight) |
Solids by Volume | : %100 (A+B) |
Pot Life (+10C) | : 80 minutes |
(+30C) | : 25 minutes |
Wait Time Between Coats | : 24 hours/ at 20C |
Ready for Light Traffic | : 24 hours/ at 20C |
Full Cure | : 7 day / at 20C |
Packaging | :15 kg |
Coverage | : 300-500 g/m2 |
Application System | : Toothed Trowel, Spiked Roller |
It is a two-component product and it should, therefore, be prepared at the mix ratio specified for the guantity to be used, taking into consideration the pot life. For a homogenous mixture, make sure that the product temperature should not be less than 159C.
Component A should be stirred by itself by use of a mechanical mixer guickiy and then the hardener (Component B) should be added, taking care of the mix ratio. Components A and B should be stirred for minimum 3 minutes until you have a homogenous mixture.
When ready for application, the product is applied by trowel until the surface is saturated well and pores are dosed. Time for overcoating is minimum 8 hours (20 C) and maximum 10 days. It is very important that the second coat should be applied within the time for overcoating specified above. It reaches to a full mechanical and chemical strength in about 7 days.
Company
Parquet Products
Waterproof Products
Contact Information
Head Office Address
Orucreis Mah.Tekstilkent Cad. No: 10V Blok No:214 (2. Kat) Tekstilkent Ticaret Merkezi Esenler / ISTANBUL / TURKEY
Factory Address
Buyukbakkalkoy Mahallesi Yakacik Yolu Sokak No: 2/1 Merkez
Maltepe / ISTANBUL / TURKEY