It is an epoxy resin-based, two-component and solvent-free color floor coating material with a feature of self-levelling for use as base coat for multi-coat floor coating systems in thickness of 1-3 mm.
- Warehouses, garages and hangars for all industrial flooring;
- Units with a traffic of forklifts, loaders and heavy vehicles; and
- As color base coat for floors subject to medium to heavy load and as single coat for the areas with light traffic and, accordingly, low wear.
- Solvent-free;
- Covers concrete defects by spreading like a level balancing mortar;
- High wetting capability;
- Possibility to produce in any color;
- High compression strength;
- Easy to apply; long overcoating time with resilient structure, imparting even and smooth surface due to good spread.
-
Finish : Semi Gloss Color : Any Color Density : 1,80 ± 0,05 kg/l (A+B) Mixing Ratio : 10:1 (A:B— weight) Solids by Volume : %100 (A+B) Pot Life (+10C) : 80 minutes (+30C) : 40 minutes Wait Time Between Coats : 24 hours/ at 20C Ready for Light Traffic : 2 days/ at 20C Full Cure : 7 days / at 20C Compression Strength : 80 N/mm2 (in full cure) Taber Abrasion Resistance : 120 mg (in full cure) Flexural Strength : 40 N/mm2 (in full cure) Shore D Hardness : 75-78 Application System : Toothed Trowel, Spiked Roller Packaging :22 kg set
It isa two-component product and it should, therefore, be prepared at the mix ratio specified for the guantity to be used, taking into consideration the pot life. For a homogenous mixture, make sure that the product temperature should not be less than 15 C, Component A should be stirred by itself by use of a mechanical mixer guickly and then the hardener (Component B) should be added, taking care of the mix ratio. Components A and B should be stirred by using a mechanical mixer for minimum 3 minutes until you have a homogenous mixture, Make sure the prepared mixture is consumed during the pot life of the mixture. After made ready to apply, the mixture is poured over the surface and spread by help of a toothed trowel to give it the specified thickness. Air bubbles on the surface are eliminated within 15 minutes by using spiked roller. In case the concrete surface is very problematic and contains cracks, the material will act as a balancing mortar thanks to its feature of self-levelling. Air bubbles of the fresh coating thoroughly spread over the surface should be eliminated. Roller is used for thin coating. Wait time between the coats is minimum 24 hours (20 C) and maximum 10 days. It is very important that the second coat should be applied within the time for overcoating specified above, It reachestoa full omechanical and chemical strength in about 7 days
Related products
Company
Parquet Products
Waterproof Products
Contact Information
Head Office Address
Orucreis Mah.Tekstilkent Cad. No: 10V Blok No:214 (2. Kat) Tekstilkent Ticaret Merkezi Esenler / ISTANBUL / TURKEY
Factory Address
Buyukbakkalkoy Mahallesi Yakacik Yolu Sokak No: 2/1 Merkez
Maltepe / ISTANBUL / TURKEY