HELLTECH FLOOR EPOXY 3D – 3D floor filler, epoxy compound for self-leveling floor.Transparent two-component epoxy compound for the installation of self-leveling seamless floors for industrial and civil purposes.
HELLTECH FLOOR EPOXY 3D is used as finishing, leveling floors with sealing decorative chips, different graphics, 3D images, logos and the like, in order to improve the wear resistance of the coating. When finishing mosaic concrete floors emphasizes the structure of the surface, creates the effect of a wet stone.
The epoxy coating is designed for rooms with high mechanical and chemical loads.
Epoxy 3D coating is laid on concrete, rigid metal and wooden structures, forms a thick wear-resistant coating.
Epoxy compound HELLTECH FLOOR EPOXY 3D is used as a seamless protective and decorative wear-resistant coating at commercial and industrial enterprises, storage, office and residential premises, food and pharmaceutical industries, medical institutions, etc.
- High Mechanical Strength
- High Chemical Resistance
- Adhesion And Wear Resistance
- Dustproofness
- Safety For People And Pets
- High Decorative Properties
- Ease Of Cleaning
- UV Resistance
- It Does Not Contain Solvents.
- Application
The surface is pre-polished, due to grinding cement (lime) milk is removed, the surface is stronger and smoother. The base for the self-leveling device should be clean and dry (base moisture is not more than 4%), durable (at least 20 MPa in compression, tensile strength not less than 1.5 MPa).
The substrate is coated with HELLTECH FLOOR EPOXY 3D (250-350g / m2) before coating with HELLTECH FLOOR EPOXY 3D. If necessary, it is allowed to use HELLTECH FLOOR EPOXY 3D as a primer with a consumption of 0.3-0.5 kg / m2.
HELLTECH FLOOR EPOXY 3D coating is applied after complete curing of the primer (24 hours at t + 20 ° C), laying of decorative elements and complete drying of the patterns.
Drawing
Component A is pre-mixed with a low-speed drill with a nozzle (3-5 minutes). Then, in the pre-mixed component A add component B (hardener). The hardener is supplied complete. Stir the mixture thoroughly with a low speed drill (800 rpm) with a paddle stirrer for 2–3 minutes, avoiding air and neural kneading.
HELLTECH FLOOR EPOXY 3D should be applied as a spill and spread over the surface with a notched trowel, keeping it at a 45° angle. After applying the binder (after 5-10 min.) Rolled with a needle roller to remove bubbles. It is recommended to use special needle soles to move around the freshly topped floor. The next coating layer can be applied in no more than 24 hours at a temperature of + 20 ° C.
All operations for mixing, applying and rolling the coating with a needle roller must be carried out during the time of use of the material: 20-25 minutes! Application temperature from + 15 ° _. After completion of the work, the tool is cleaned with a solvent. The drying time of the coating to the pedestrian load at t + 20 ° _ is 48 hours. When used as a primer – 12 hours. at t + 20 °C
The set time of full mechanical strength, at t + 20 °C- 7 days.
The time taken to complete the full chemical strength, at t + 20 °C, is 14 days.
Type of packaging
Set of 16 kg EPOXY 3D; The bucket consists of 10 kg of component A and 6 kg of component B in a gallon.
The composition should be stored in a tightly closed container, at a temperature of from +15 to + 30 ° C. Do not heat up. Keep away from fire and direct sunlight. Warranty period of storage in the original packaging – 6 months from the date of manufacture.
The tool necessary for drawing
- Low speed drill (not more than 800 rpm) with a special mixer. The length of the axis of the agitator must be greater than the depth of the mixing tank.
- Spatula to distribute material in hard-to-reach places (under batteries, in corners, at doors, etc.).
- Squeegee with an adjustable gap to distribute material evenly over the surface.
- Aeration needle roller to remove air bubbles.
- Special soles on spikes for movement on a freshly applied coating – according to the number of workers with needle rollers.
- Solvent cleaning tool.
Before applying the material, it is necessary to ensure the quality of the surface preparation and priming carried out.
The presence of pores in the primed base will not allow to obtain a defect-free coating!
- The consumption of HELLTECH FLOOR EPOXY 3D (A + B) per 1m² of surface with a thickness of 1mm is – 1 kg.
- Consumption HELLTECH FLOOR EPOXY 3D A + B) per 1m² of surface when priming – 0.3-0.5 kg / m².
Safety precautions
Carrying out the coating in a ventilated room. Do not allow material to enter the eyes and on exposed skin. When carrying out work it is recommended to use protective glasses and gloves.
Related products
Company
Parquet Products
Waterproof Products
Contact Information
Head Office Address
Orucreis Mah.Tekstilkent Cad. No: 10V Blok No:214 (2. Kat) Tekstilkent Ticaret Merkezi Esenler / ISTANBUL / TURKEY
Factory Address
Buyukbakkalkoy Mahallesi Yakacik Yolu Sokak No: 2/1 Merkez
Maltepe / ISTANBUL / TURKEY