Mixing Procedure:
It is a two-component product and it should, therefore, be propared at the mix ratio specified for the quantity to be used, taking into consideration the pot life. For a homogenous mixture, make sure that the product temperature should not be less than 15°C. Component A should be stirred by itself by use of a mechanical mixer quickly and then the hardener (Component B) should be added, taking care of the mix ratio. Components A and B should be stirred for minimum 3 minutes until you have a homogenous mixture.
Surface Application:
After made ready to apply, the mixture is preferably applied by airless spray or roller in amount specified in the paint system or in such amount to obtain the desired dry film thickness as controlled by wet film comb. Wait time between the coats is minimum 24 hours (20°C) and maximum 5 days. It is very important that the second coat should be applied within the time for overcoating specified above. lt reaches to a full mechanical and chemical strength in about 7 days.
Clean Up:
Cellulosic or Polyurethane thinner.