Mixing Procedure
It is a two-component product and it should, therefore, be prepared at the mix ratio specified for the guantity to be used, taking into consideration the pot life. For a homogenous mixture, make sure that the product temperature should not be less than 15°C. Component A should be stirred by itself by use of a mechanical mixer guickiy and then the hardener (Component B) should be added, taking care of the mix ratio. Components A and B should be stirred by using a mechanical mixer for minimum 3 minutes until you have a homogenous mixture. Make sure the prepared mixture is consumed during the pot life of the mixture.
Surface Application
After made ready to apply, the mixture is preferabiy applied by airless spray or roller in amount specified in the paint system or in such amount to obtain the desired dry film thickness as controlled by wet film comb. Wait time between the coats is minimum 24 hours (20°C) and maximum 5 days. It is very important that the second coat should be applied within the time for overcoating specified above. It reaches to a full mechanical and chemical strength in about 7 days.
Clean Up
Cellulosic or Polyurethane thinner.